HomeNewsPhotos

Photos

7th CES renovates traffic circle
The beautification of the Dyess Air Force Base traffic circle was completed on Aug. 7, 2018 and took a total of 500 man-hours from the 7th Civil Engineer Squadron. Due to the careful pre-planning by the Airmen, the traffic circle was closed only twice for a period of eight hours, and was open for all other periods of the beautification. (U.S. Air Force photograph by Senior Airman Rebecca Van Syoc)

Download Image: Full Size (2.93 MB)
Tags:
Photo by: SrA Rebecca Van Syoc |  VIRIN: 180823-F-NC441-0007.JPG