HomeNewsPhotos

Photos

Getting the B-1 ready for takeoff
U.S. Air Force Airmen assigned to the 7th Component Maintenance Squadron, install a bearing into a fan rotor at Dyess Air Force Base, Texas, March 30, 2017. The Airmen of the accessory maintenance section perform maintenance on augmenters, fans, and the low pressure turbines of the B-1B Lancer engine. (U.S. Air Force Senior Airman Alexander Guerrero)

Download Image: Full Size (0.8 MB)
Tags:
Photo by: Senior Airman Alexander Guerrero |  VIRIN: 170329-F-OR423-088.JPG