Photos

Keyword: Category: Tag: Sort By:
U.S. Air Force Maj. Iven Vian, 10th Flight Test Squadron, left, and Maj. James Silva, 337th Test and Evaluation Squadron, shutdown the engines of a newly upgraded B-1B Lancer after landing May 7, 2014, at Dyess Air Force Base, Texas. The aircraft received a combination of three different upgrades, which include a Fully Integrated Data Link, a Vertical Situation Display upgrade, and a Central Integrated System upgrade. These three modifications fall under the Integrated Battle Station initiative, which is is scheduled to be installed on all B-1 aircraft 2019. (U.S. Air Force photo by Airman 1st Class Alexander Guerrero/Released)




U.S. Air Force Maj. Iven Vian, 10th Flight Test Squadron, left, and Maj. James Silva, 337th Test and Evaluation Squadron, shutdown the engines of a newly upgraded B-1B Lancer after landing May 7, 2014, at Dyess Air Force Base, Texas. The aircraft received a combination of three different upgrades, which include a Fully Integrated Data Link, a Vertical Situation Display upgrade, and a Central Integrated System upgrade. These three modifications fall under the Integrated Battle Station initiative, which is is scheduled to be installed on all B-1 aircraft 2019. (U.S. Air Force photo by Airman 1st Class Alexander Guerrero/Released)

Related Imagery
Airman st Class Alexander GuerreroReleased
140507-F-OR423-004.JPG

DOWNLOAD PHOTO
(3.84 MB)



Tags
B-1B Lancer, 7th Mission Support Group



< Back to Main Gallery