Dyess flight line maintains mission readiness
Mr. Pablo Cruz power washes the taxi-way Feb. 22, 2012, preparing it for repairs, at Dyess Air Force Base, Texas. The taxi way shoulder repair project is estimated to be finished March 12, 2012 and cost approximately $1.7 million. (U.S. Air Force photo by Airman 1st Class Jonathan Stefanko/ Released)